Perovskite Reliability · Outdoor Verification

Results
Field Performance Plot - Commercial Single Junction/Tandem Perovskite Modules
The field performance plot presents updated results on the years to 80% of peak outdoor efficiency (P80) for all perovskite and tandem modules currently under assessment across both PROVE sites (see Site Details below). The horizontal position represents the module's peak outdoor efficiency. The ring around each datapoint indicates module area (see Area Details below). Datapoints with an arrow indicate modules that have not reached the defined P80 threshold (see below).

Definitions
Peak Outdoor Efficiency:
The daily energy delivered by the module divided by the daily energy incident on the module. For tandem modules, the daily efficiency is calculated using the total combined output of all junctions, regardless of whether the module has two, three, or four terminals. For modules with multiple terminals, each terminal pair is connected to an individual load, and the output from all junctions is combined to determine the overall module efficiency. Incident energy is defined as the irradiance (as measured by the pyranometer) multiplied by the device area (either aperture or total module area, depending on device setup).
Years to reach 80% of peak (P80):
The number of years before a device falls below 80% of its peak daily efficiency for 3 consecutive valid days. Due to observed seasonal variances, modules are continually monitored before the first detection of P80. The extended definition of P80 now set as the point at which performance permanently drops below 80% of peak outdoor efficiency (without any seasonal recovery above 80%).
Site details
Modules are currently being tested at two sites:
1) Kensington (KENS)
Location: 33.9175762 S, 151.2267605 E, approximately 30m above mean sea level.
Mounting: Fixed tilt rack set at 30° above horizontal and 10° azimuth (10° E of true North).
Site Capacity: EXHAUSTED

2) Manly Vale (MV)
Location: 33.7808340 S, 151.2589114 E, approximately 30m above mean sea level.
Mounting: Fixed tilt rack set at 30° above horizontal and 0° azimuth (facing true North).
Site Capacity: approx. 130 m2 (15% allocated as of 10/11/2026)

Measurement details
Irradiance is measured in the array plane using an ISO 9060 rated class A pyranometer.
Continuous monitoring of module performance is obtained using in-house developed and calibrated DC loads. Devices are kept at maximum power point (MPP) unless specific measurement conditions are requested/required (modules kept at Isc condition overnight). Output data collected every 2-5 seconds, and IV sweep performed every hour unless otherwise specified.
PL imaging is taken at set intervals using synchronised load control (MPP - Voc). Concurrent thermal imaging also performed alongside PL images.
Soiling is assessed via site inspection and imaging analysis.
Data filtering details
Valid days for analysis are defined by the following conditions:
-
Minimum daily insolation: 4 kWh/m² (filters out low insolation days)
-
Irradiance threshold: > 150 W/m² (filters out data outside peak sun hours window, including overnight data)
-
Data coverage: >0.8 (i.e. 80% of daytime hours above the set insolation threshold have complete datasets for irradiance and module power output)